Project Overview
A new, luxury five-star hotel in East Africa required a highly reliable and space-efficient electrical distribution system to support its world-class facilities and ensure an uncompromised guest experience. The challenge involved delivering a turnkey power solution within a tight project timeline, capable of operating flawlessly in a demanding environment.
Our Solution
Rockwill answered this challenge with a fully integrated, containerized 33kV compact substation solution. The plug-and-play design featured:
The pre-assembled, containerized approach significantly reduced on-site installation time and costs, while ensuring superior quality control.
Value Delivered
The solution provided the hotel with a resilient and autonomous power infrastructure. Its intelligent protection and reclosing capabilities minimize outage times, guaranteeing continuous power for critical hotel operations. This project underscores Rockwill's capability to deliver robust, engineered-to-order solutions that meet the precise standards of international flagship projects, empowering development and economic growth in dynamic regions.